GridPulse ZA

South Africa's electricity, hour by hour

Live mix › Municipal tariffs › Tshwane (Pretoria)

Tshwane (Pretoria) electricity tariffs, 2025/26

Every approved electricity tariff in City of Tshwane for 2025/26, from the schedules the municipality and the regulator publish. All rates on this page include VAT at 15%.

Tariff year shown2025/26
600 kWh a month costsR2 419
Tariff categories33
Standard home bill+10.2% on 2024/25

A 600 kWh month, year by year

On the tariff a 600 kWh home is billed on (Domestic standard supply: single and three phase: conventional and prepaid), VAT included.

Estimate a bill for your own usage or go back to the municipality comparison.

The full 2025/26 schedule

Hover a charge for the printed wording where it needs context. Export credit scales and once-off fees are not part of a monthly bill and are not listed.

Domestic standard supply: single and three phase: conventional and prepaid

residential, conventional · one scale for both conventional and prepaid metering; main circuit breaker 80 A or less per phase

ChargeApplies toRate (VAT in)Unit
Energy0 to 100 kWh342.58c/kWh
Energy101 to 400 kWh400.94c/kWh
Energy401 to 650 kWh436.82c/kWh
Energyabove 650 kWh470.90c/kWh

Indigent: conventional and prepaid

residential, conventional · one scale for both conventional and prepaid metering; officially registered indigent consumers

ChargeApplies toRate (VAT in)Unit
Free allowance100kWh/month
Energy0 to 100 kWh341.80c/kWh
Energy101 to 400 kWh393.20c/kWh
Energy401 to 650 kWh431.39c/kWh
Energyabove 650 kWh460.30c/kWh

Domestic three-phase demand supply: conventional and prepaid

residential, conventional · both conventional and prepaid; residences with three-phase main circuit breaker over 80 A per phase; minimum demand billed 30 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge1 297.45R/month
Demand242.02R/kVA
Energy263.07c/kWh

Domestic bulk standard supply

residential, conventional · bulk domestic complexes and gated communities, single connection of at least 80 A

ChargeApplies toRate (VAT in)Unit
Fixed charge1 298.10R/month
Energy341.81c/kWh

Domestic bulk time-of-use supply

residential, tou · no seasonal differentiation printed; TOU periods per the Eskom Municflex tariff

ChargeApplies toRate (VAT in)Unit
Fixed charge1 298.10R/month
Energypeak474.42c/kWh
Energystandard320.55c/kWh
Energyoff-peak320.55c/kWh

Agricultural holdings and farm land: conventional or prepaid

agricultural, conventional · one scale for both conventional and prepaid metering; outside legally established townships, breaker 80 A or less per phase

ChargeApplies toRate (VAT in)Unit
Energy424.92c/kWh

Non-domestic single phase: conventional

business, conventional · fixed charge tiered by incoming circuit breaker rating; exactly one tier applies per customer

ChargeApplies toRate (VAT in)Unit
Fixed charge2 212.55R/month
Fixed charge2 899.31R/month
Energy366.08c/kWh

Non-domestic single phase: prepaid

business, prepaid · fixed charge tiered by incoming circuit breaker rating; exactly one tier applies per customer

ChargeApplies toRate (VAT in)Unit
Fixed charge2 106.71R/month
Fixed charge2 633.94R/month
Energy364.54c/kWh

Non-domestic three phase: conventional

business, conventional · fixed charge tiered by incoming circuit breaker rating; exactly one tier applies per customer

ChargeApplies toRate (VAT in)Unit
Fixed charge6 733.22R/month
Fixed charge10 288.26R/month
Fixed charge14 393.25R/month
Fixed charge18 077.44R/month
Fixed charge21 980.06R/month
Energy366.08c/kWh

Non-domestic three phase: prepaid

business, prepaid · fixed charge tiered by incoming circuit breaker rating; exactly one tier applies per customer

ChargeApplies toRate (VAT in)Unit
Fixed charge6 387.25R/month
Fixed charge9 665.86R/month
Energy364.54c/kWh

Low-voltage three-phase demand scale (conventional and prepaid)

business, conventional · both conventional and prepaid; annual average metered load over 50 kVA, breaker over 80 A up to 800 A; minimum demand billed 30 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge5 765.06R/month
Demand413.05R/kVA
Energy263.05c/kWh

Low-voltage three-phase demand scale: time of use (conventional and prepaid)

business, tou · high season printed as June to August, low season as September to May; TOU periods per the Eskom Municflex tariff

ChargeApplies toRate (VAT in)Unit
Fixed charge5 741.81R/month
Demand413.05R/kVA
Energywinter peak825.88c/kWh
Energysummer peak339.24c/kWh
Energywinter standard316.51c/kWh
Energysummer standard213.64c/kWh
Energywinter off-peak181.22c/kWh
Energysummer off-peak151.28c/kWh

11 kV supply scale (conventional or prepaid)

business, conventional · both conventional and prepaid; supply at 11 kV; minimum demand billed 140 kVA; closed to new connections

ChargeApplies toRate (VAT in)Unit
Fixed charge4 931.13R/month
Demand402.73R/kVA
Energy251.95c/kWh

11 kV supply scale: time of use (conventional or prepaid) and Madibeng

business, tou · high season printed as June to August, low season as September to May; minimum demand billed 140 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge4 969.87R/month
Demand411.77R/kVA
Energywinter peak824.84c/kWh
Energysummer peak315.97c/kWh
Energywinter standard301.28c/kWh
Energysummer standard195.18c/kWh
Energywinter off-peak160.57c/kWh
Energysummer off-peak138.11c/kWh

132 kV supply scale: time of use (conventional or prepaid) and MEGA

industrial, tou · high season printed as June to August, low season as September to May; average annual load 10 000 kVA or more; minimum demand billed 7 000 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge4 159.18R/month
Demand273.65R/kVA
Energywinter peak819.17c/kWh
Energysummer peak301.28c/kWh
Energywinter standard281.15c/kWh
Energysummer standard185.09c/kWh
Energywinter off-peak152.82c/kWh
Energysummer off-peak131.94c/kWh

132 kV supply scale: Wind Tunnel (conventional or prepaid)

industrial, conventional · CSIR medium-speed wind tunnel, by agreement, consumption outside City peak times

ChargeApplies toRate (VAT in)Unit
Fixed charge4 159.18R/month
Energy622.28c/kWh

275 kV supply scale: time of use (conventional or prepaid)

industrial, tou · average metered load 30 000 kVA or more; charges are the current Eskom Municflex tariff excluding monthly rental (rates not reprinted in the schedule) plus the surcharge below

ChargeApplies toRate (VAT in)Unit
Surcharge3%

Electricity reseller: domestic complexes

residential, conventional · reseller purchase tariff at the bulk point of a domestic complex

ChargeApplies toRate (VAT in)Unit
Fixed charge2 878.61R/month
Energy341.81c/kWh

Electricity reseller: domestic bulk time-of-use supply

residential, tou · reseller purchase tariff at the bulk point; no seasonal differentiation printed

ChargeApplies toRate (VAT in)Unit
Fixed charge2 878.61R/month
Energypeak474.42c/kWh
Energystandard320.55c/kWh
Energyoff-peak320.55c/kWh

Electricity reseller: non-domestic single phase: conventional

business, conventional · reseller purchase tariff at the bulk point; fixed charge tiered by breaker rating, one tier applies

ChargeApplies toRate (VAT in)Unit
Fixed charge2 209.87R/month
Fixed charge2 896.56R/month
Energy341.81c/kWh

Electricity reseller: non-domestic single phase: prepaid

business, prepaid · reseller purchase tariff at the bulk point; fixed charge tiered by breaker rating, one tier applies

ChargeApplies toRate (VAT in)Unit
Fixed charge2 106.60R/month
Fixed charge2 813.99R/month
Energy341.81c/kWh

Electricity reseller: non-domestic three phase: conventional

business, conventional · reseller purchase tariff at the bulk point; fixed charge tiered by breaker rating, one tier applies

ChargeApplies toRate (VAT in)Unit
Fixed charge6 732.90R/month
Fixed charge10 287.78R/month
Fixed charge14 392.59R/month
Fixed charge18 076.60R/month
Fixed charge21 984.63R/month
Energy342.06c/kWh

Electricity reseller: non-domestic three phase: prepaid

business, prepaid · reseller purchase tariff at the bulk point; fixed charge tiered by breaker rating, one tier applies

ChargeApplies toRate (VAT in)Unit
Fixed charge6 386.95R/month
Fixed charge9 668.21R/month
Energy342.06c/kWh

Electricity reseller: low-voltage three-phase demand scale

business, conventional · reseller purchase tariff at the bulk point; annual average metered load over 50 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge20 141.89R/month
Demand394.74R/kVA
Energy263.05c/kWh

Electricity reseller: low-voltage three-phase demand scale: time of use

business, tou · reseller purchase tariff at the bulk point; high season printed as June to August, low season as September to May

ChargeApplies toRate (VAT in)Unit
Fixed charge20 141.89R/month
Demand394.47R/kVA
Energywinter peak739.04c/kWh
Energysummer peak303.07c/kWh
Energywinter standard289.94c/kWh
Energysummer standard195.82c/kWh
Energywinter off-peak166.00c/kWh
Energysummer off-peak138.38c/kWh

Electricity reseller: 11 kV supply scale

business, conventional · reseller purchase tariff at the bulk point; supply at 11 kV, average metered load over 200 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge28 776.23R/month
Demand394.47R/kVA
Energy247.81c/kWh

Electricity reseller: 11 kV supply scale: time of use

business, tou · reseller purchase tariff at the bulk point; high season printed as June to August, low season as September to May; minimum demand billed 140 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge28 777.60R/month
Demand391.78R/kVA
Energywinter peak736.55c/kWh
Energysummer peak282.18c/kWh
Energywinter standard275.21c/kWh
Energysummer standard178.64c/kWh
Energywinter off-peak146.11c/kWh
Energysummer off-peak125.96c/kWh

Reselling to end users: domestic tariffs

residential, conventional · inclining block tariffs for reselling beyond the domestic bulk metering point; conventional and prepaid submetering; resellers may charge no other fee

ChargeApplies toRate (VAT in)Unit
Energy0 to 100 kWh342.58c/kWh
Energy101 to 400 kWh400.94c/kWh
Energy401 to 650 kWh436.80c/kWh
Energyabove 650 kWh470.90c/kWh

Reselling to end users: business or non-domestic single phase: conventional and prepaid

business, conventional · both conventional and prepaid; fixed charge tiered by breaker rating, one tier applies

ChargeApplies toRate (VAT in)Unit
Fixed charge859.69R/month
Fixed charge1 430.22R/month
Fixed charge2 000.76R/month
Fixed charge2 852.95R/month
Energy366.08c/kWh

Reselling to end users: business or non-domestic three phase: conventional and prepaid

business, conventional · both conventional and prepaid; fixed charge tiered by breaker rating, one tier applies

ChargeApplies toRate (VAT in)Unit
Fixed charge2 140.16R/month
Fixed charge4 282.81R/month
Fixed charge5 994.54R/month
Fixed charge8 847.27R/month
Fixed charge10 558.89R/month
Fixed charge13 127.59R/month
Fixed charge15 696.32R/month
Energy366.08c/kWh

Embedded generation charge: domestic single or three phase

residential, conventional · Part III renewable/embedded-generation charge: monthly availability charge for grid-tied embedded-generation customers who are net consumers; energy, fixed and demand charges per the applicable Part I scale

ChargeApplies toRate (VAT in)Unit
Network charge342.47R/month

Embedded generation charge: agricultural holdings and farm lands

agricultural, conventional · Part III renewable/embedded-generation charge: monthly availability charge for grid-tied embedded-generation customers; energy charges per Part I tariffs

ChargeApplies toRate (VAT in)Unit
Network charge1 330.78R/month

Wheeling tariff

business, conventional · Part III: use-of-system charge per kWh for wheeling electricity through the City of Tshwane network; not a metered supply class

ChargeApplies toRate (VAT in)Unit
Network charge117.44c/kWh

Sources

The numbers above are transcribed from these documents:

Other municipalities in Gauteng: Ekurhuleni, Emfuleni (Vereeniging), Johannesburg, Mogale City (Krugersdorp).

See the live mix on GridPulse ZA