GridPulse ZA

South Africa's electricity, hour by hour

Live mix › Municipal tariffs › Emfuleni (Vereeniging)

Emfuleni (Vereeniging) electricity tariffs, 2026/27

Every approved electricity tariff in Emfuleni Municipality for 2026/27, from the schedules the municipality and the regulator publish. All rates on this page include VAT at 15%.

Tariff year shown2026/27
600 kWh a month costsR2 638
Tariff categories23
Standard home bill+9.0% on 2025/26

A 600 kWh month, year by year

On the tariff a 600 kWh home is billed on (Domestic Single Phase (High) / Three Phase/Flat/ Town Houses), VAT included.

Estimate a bill for your own usage or go back to the municipality comparison.

The full 2026/27 schedule

Hover a charge for the printed wording where it needs context. Export credit scales and once-off fees are not part of a monthly bill and are not listed.

IBT: FBE (Low) Tariff

residential, conventional · inclining block tariff with seasonal blocks and no basic charge; the schedule does not state the metering type; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh, summer250.70c/kWh
Energy51 to 350 kWh, summer293.16c/kWh
Energy351 to 600 kWh, summer391.33c/kWh
Energyabove 600 kWh, summer471.05c/kWh
Energy0 to 50 kWh, winter335.32c/kWh
Energy51 to 350 kWh, winter377.61c/kWh
Energy351 to 600 kWh, winter505.31c/kWh
Energyabove 600 kWh, winter606.36c/kWh
Fixed charge524.24R/month
Free allowance50kWh/month

Domestic Single Phase (High) / Three Phase/Flat/ Town Houses

residential, conventional · standard domestic scale with a monthly basic charge and seasonal inclining blocks; the schedule does not split prepaid and conventional metering; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh, summer250.48c/kWh
Energy51 to 350 kWh, summer293.16c/kWh
Energy351 to 600 kWh, summer391.57c/kWh
Energyabove 600 kWh, summer471.05c/kWh
Energy0 to 50 kWh, winter327.53c/kWh
Energy51 to 350 kWh, winter368.93c/kWh
Energy351 to 600 kWh, winter493.64c/kWh
Energyabove 600 kWh, winter592.33c/kWh
Fixed charge524.24R/month
Fixed charge1 179.36R/month

Domestic Bulk resellers

residential, conventional · bulk supply to residential resellers

ChargeApplies toRate (VAT in)Unit
Energysummer335.20c/kWh
Energywinter453.56c/kWh
Fixed charge1 968.19R/month

Commercial(Prepaid)

business, prepaid · per the municipality's tariff application: supplies up to 3 x 150 A (and/or 100 kVA)

ChargeApplies toRate (VAT in)Unit
Fixed charge2 104.43R/month
Energysummer458.75c/kWh
Energywinter478.88c/kWh

Commercial(Conventional)

business, conventional

ChargeApplies toRate (VAT in)Unit
Fixed charge2 209.30R/month
Energysummer427.92c/kWh
Energywinter591.76c/kWh

Commercial (SPU) Low Voltage 400V

business, conventional · per the municipality's tariff application: 400 V supplies above 100 kVA or 150 A

ChargeApplies toRate (VAT in)Unit
Fixed charge7 771.16R/month
Demand775.42R/kVA
Energysummer196.36c/kWh
Energywinter285.75c/kWh

Commercial (SPU) >400V & ≤66kV Medium Voltage

business, conventional · per the municipality's tariff application: medium voltage supplies below 1 MVA

ChargeApplies toRate (VAT in)Unit
Fixed charge7 771.16R/month
Demand801.21R/kVA
Energysummer196.35c/kWh
Energywinter285.75c/kWh

Commercial >400V & ≤66kV LPU-Medium Voltage

business, conventional · per the municipality's tariff application: medium voltage supplies above 1 MVA (1000 kVA)

ChargeApplies toRate (VAT in)Unit
Fixed charge7 771.06R/month
Demand801.19R/kVA
Energysummer206.71c/kWh
Energywinter330.59c/kWh

Commercial LPU-High Voltage >66kV & ≤ 132kV

business, conventional · per the municipality's tariff application: supplies above 66 kV up to 132 kV, above 1 MVA (1000 kVA)

ChargeApplies toRate (VAT in)Unit
Fixed charge7 771.16R/month
Demand761.18R/kVA
Energysummer206.52c/kWh
Energywinter287.33c/kWh

AGRICULTURAL TARIFFS: Conventional

agricultural, conventional · per the municipality's tariff application: 230 V single phase

ChargeApplies toRate (VAT in)Unit
Fixed charge552.06R/month
Energysummer446.02c/kWh
Energywinter591.72c/kWh

AGRICULTURAL TARIFFS: Conventional Three Phase

agricultural, conventional · per the municipality's tariff application: 400 V three phase, up to 3 x 150 A or 100 kVA

ChargeApplies toRate (VAT in)Unit
Fixed charge1 104.09R/month
Energysummer404.55c/kWh
Energywinter526.33c/kWh

AGRICULTURAL TARIFFS: PREPAID

agricultural, prepaid

ChargeApplies toRate (VAT in)Unit
Fixed charge542.93R/month
Fixed charge1 241.13R/month
Energysummer491.44c/kWh
Energywinter512.73c/kWh

Miniflex Tariff

industrial, tou · time of use; 400 V, below 1 MVA per the municipality's application; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge6 987.26R/month
Demand154.18R/kVA
Demand67.46R/kVA
Reactive energy39.24c/kVArh
Energysummer peak484.74c/kWh
Energysummer standard321.31c/kWh
Energysummer off-peak183.75c/kWh
Energywinter peak1 431.11c/kWh
Energywinter standard414.16c/kWh
Energywinter off-peak193.83c/kWh

Megaflex 400V and 66 KV Medium Voltage

industrial, tou · time of use; above 1 MVA per the municipality's application; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge41 150.73R/month
Demand173.89R/kVA
Demand154.18R/kVA
Demand67.46R/kVA
Reactive energy39.25c/kVArh
Energysummer peak423.28c/kWh
Energysummer standard259.34c/kWh
Energysummer off-peak175.08c/kWh
Energywinter peak1 380.21c/kWh
Energywinter standard359.70c/kWh
Energywinter off-peak195.26c/kWh

Bulk Nightsave

industrial, tou · bulk supply, no new customers per the municipality's application; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge539.29R/account/day
Fixed charge10 568.12R/account/day
Fixed charge243.03R/POD/day
Fixed charge336.66R/POD/day
Demand81.73R/kVA
Demand43.10R/kVA
Demand21.57R/kVA
Demand66.65R/kVA
Energywinter193.28c/kWh
Energysummer150.83c/kWh
Demandwinter600.98R/kVA
Demandsummer84.01R/kVA
Levy21.02c/kWh
Levy1.07c/kWh
Levy8.52c/kWh

Bulk Time of Use: Bulk Megaflex

industrial, tou · bulk supply, no new customers per the municipality's application; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge530.43R/account/day
Fixed charge10 396.06R/account/day
Fixed charge243.03R/POD/day
Fixed charge337.48R/POD/day
Demand21.56R/kVA
Demand43.09R/kVA
Demand81.72R/kVA
Reactive energy38.70c/kVArh
Levy21.00c/kWh
Levy8.52c/kWh
Levy1.07c/kWh
Energysummer peak264.61c/kWh
Energysummer standard182.77c/kWh
Energysummer off-peak112.98c/kWh
Energywinter peak800.07c/kWh
Energywinter standard246.33c/kWh
Energywinter off-peak133.81c/kWh

TOU - Nightsave (≤100 kVA)

industrial, tou · the NERSA table prints one TOU Nightsave tariff with three size bands; stored as one category per band; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge1 976.55R/month
Demand96.97R/kVA
Demand91.47R/kVA
Demand122.36R/kVA
Energysummer246.01c/kWh
Energywinter305.28c/kWh
Demandsummer108.36R/kVA
Demandwinter739.51R/kVA

TOU - Nightsave (< 1 MVA)

industrial, tou · the NERSA table prints one TOU Nightsave tariff with three size bands; stored as one category per band; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge9 509.55R/month
Demand88.73R/kVA
Demand93.26R/kVA
Demand112.24R/kVA
Energysummer246.01c/kWh
Energywinter305.28c/kWh
Demandsummer108.35R/kVA
Demandwinter739.51R/kVA

TOU - Nightsave (≥ 1 MVA)

industrial, tou · the NERSA table prints one TOU Nightsave tariff with three size bands; stored as one category per band; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge33 107.60R/month
Demand88.73R/kVA
Demand95.06R/kVA
Demand111.60R/kVA
Energysummer246.01c/kWh
Energywinter305.28c/kWh
Demandsummer149.45R/kVA
Demandwinter863.05R/kVA

Bulk Miniflex

industrial, tou · bulk supply, no new customers per the municipality's application; the service and administrative charges depend on the supply size band; units missing from rows of the NERSA table are taken from the municipality's tariff application schedule

ChargeApplies toRate (VAT in)Unit
Fixed charge38.39R/account/day
Fixed charge175.23R/account/day
Fixed charge539.32R/account/day
Fixed charge538.05R/account/day
Fixed charge10 568.06R/account/day
Fixed charge9.29R/POD/day
Fixed charge49.15R/POD/day
Fixed charge97.58R/POD/day
Fixed charge243.04R/POD/day
Fixed charge337.49R/POD/day
Demand64.62R/kVA
Demand66.65R/kVA
Demand18.29R/kVA
Reactive energy16.58c/kVArh
Levy21.04c/kWh
Levy1.08c/kWh
Levy8.53c/kWh
Energysummer peak265.51c/kWh
Energysummer standard182.78c/kWh
Energysummer off-peak113.78c/kWh
Energywinter peak800.08c/kWh
Energywinter standard246.41c/kWh
Energywinter off-peak133.81c/kWh

Vacant stands: Residential Single/3 Phase / Flats / Townhouses

residential, conventional · monthly basic charge on an empty or vacant stand; the NERSA table prints the item without a vacant-stand heading, the municipality's application and the NERSA capture workbook label it Empty or Vacant Stands

ChargeApplies toRate (VAT in)Unit
Levy1 110.30R/month

Vacant stands: Business/Commercial Industrial

business, conventional · monthly basic charge on an empty or vacant stand; the NERSA table prints the item without a vacant-stand heading, the municipality's application and the NERSA capture workbook label it Empty or Vacant Stands

ChargeApplies toRate (VAT in)Unit
Levy2 212.52R/month

Vacant stands: Agricultural

agricultural, conventional · monthly basic charge on an empty or vacant stand; the NERSA table prints the item without a vacant-stand heading, the municipality's application and the NERSA capture workbook label it Empty or Vacant Stands

ChargeApplies toRate (VAT in)Unit
Levy1 083.20R/month

Sources

The numbers above are transcribed from these documents:

Other municipalities in Gauteng: Ekurhuleni, Johannesburg, Mogale City (Krugersdorp), Tshwane (Pretoria).

See the live mix on GridPulse ZA