uMhlathuze (Richards Bay) electricity tariffs, 2026/27

Every approved electricity tariff in City of uMhlathuze for 2026/27, from the schedules the municipality and the regulator publish. All rates on this page include VAT at 15%.

uMhlathuze bills its own municipal surcharge on top of the regulator-approved energy rates, about 31% on home tariffs. The estimates here include it, and the schedule below lists it as a separate levy. Conventional meters also pay a monthly service charge that prepaid meters do not.

Tariff year shown2026/27
600 kWh a month costsR1 692
Tariff categories12
Standard home bill+0.5% on 2025/26

A 600 kWh month, year by year

On the tariff a 600 kWh home is billed on (Domestic Tariffs), VAT included.

Estimate a bill for your own usage or go back to the municipality comparison.

The full 2026/27 schedule

Hover a charge for the printed wording where it needs context. Export credit scales and once-off fees are not part of a monthly bill and are not listed.

Domestic Tariffs

residential, conventional · inclining block tariff; NERSA prints one domestic tariff with a basic charge, which the city's tariff book charges to conventional meters only (its 'Residential Conventional Service Charge 1 Phase'; three phase or online metering pays a higher service charge not printed by NERSA); the city bills a municipal surcharge on top of every block, quoted per block; values as printed (blocks 3 to 5 carry 3 and 4 decimals); the RfD prints block changes of -0,72%, -0,89%, 0,94%, 1,02% and 1,27% and a basic charge change of 2,72%, against the 7,22% average increase

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh144.95c/kWh
Energy51 to 350 kWh184.22c/kWh
Energy351 to 600 kWh264.74c/kWh
Energy601 to 1500 kWh276.84c/kWh
Energyabove 1500 kWh315.84c/kWh
Fixed charge400.99R/month
Levy0 to 50 kWh0.46R/kWh
Levy51 to 350 kWh0.58R/kWh
Levy351 to 600 kWh0.83R/kWh
Levy601 to 1500 kWh0.87R/kWh
Levyabove 1500 kWh0.99R/kWh

Domestic Tariffs

residential, prepaid · the same NERSA-approved blocks without the basic charge: the city's tariff book and billing tariffs apply these blocks to prepaid residential meters and charge the service charge to conventional meters only; the municipal surcharge applies here too, quoted per block; values as printed (blocks 3 to 5 carry 3 and 4 decimals); the RfD prints block changes of -0,72%, -0,89%, 0,94%, 1,02% and 1,27% and a basic charge change of 2,72%, against the 7,22% average increase

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh144.95c/kWh
Energy51 to 350 kWh184.22c/kWh
Energy351 to 600 kWh264.74c/kWh
Energy601 to 1500 kWh276.84c/kWh
Energyabove 1500 kWh315.84c/kWh
Levy0 to 50 kWh0.46R/kWh
Levy51 to 350 kWh0.58R/kWh
Levy351 to 600 kWh0.83R/kWh
Levy601 to 1500 kWh0.87R/kWh
Levyabove 1500 kWh0.99R/kWh

FBE Tariff

residential, prepaid · free basic electricity tariff for registered indigent customers: block 1 (0 to 50 kWh) is free, higher blocks at the domestic rates; metering not stated, printed without a basic charge

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh0.00c/kWh
Energy51 to 350 kWh184.22c/kWh
Energy351 to 600 kWh264.74c/kWh
Energy601 to 1500 kWh276.84c/kWh
Energyabove 1500 kWh315.84c/kWh
Free allowance50kWh/month
Levy51 to 350 kWh0.58R/kWh
Levy351 to 600 kWh0.83R/kWh
Levy601 to 1500 kWh0.87R/kWh
Levyabove 1500 kWh0.99R/kWh

Commercial Prepaid

business, prepaid · business customers on prepayment meters (the city's tariff book applies Comflex to all prepaid business customers)

ChargeApplies toRate (VAT in)Unit
Energy318.42c/kWh

Comflex Conventional

business, conventional · conventionally metered business customers with a notified maximum demand up to 87 kVA (city's tariff book); the city also bills an electrification and rural subsidy levy of 0,0547 R/kWh to non-residential customers, not printed by NERSA

ChargeApplies toRate (VAT in)Unit
Fixed charge890.51R/month
Energy312.13c/kWh

Industrial Seasonal Tariffs: Demflex 11kV

industrial, conventional · seasonal demand tariff at 11 kV; name as printed (11 kV is a medium voltage supply); seasons as printed (High and Low Demand Season); the city's billing tariffs label them Jul - Aug and Sep - May; the city's 2026/27 billing tariffs add municipal surcharges to the energy, demand and network access charges (for example high season energy: plus 0,3492 R/kWh, billed 1,7345 R/kWh) and bill an electrification and rural subsidy levy of 0,0547 R/kWh; NERSA's table prints neither

ChargeApplies toRate (VAT in)Unit
Fixed charge5 487.57R/month
Fixed charge2 153.41R/month
Demand93.83R/kVA
Demand93.83R/kVA
Demandwinter732.89R/kVA
Demandsummer248.61R/kVA
Energywinter159.31c/kWh
Energysummer109.81c/kWh

Industrial Demflex (Low Voltage) 400V

industrial, conventional · seasonal demand tariff at 400 V; seasons as printed (High and Low Demand Season); the city's billing tariffs label them Jul - Aug and Sep - May; the city's 2026/27 billing tariffs add municipal surcharges to the energy, demand and network access charges (for example high season energy: plus 0,3797 R/kWh, billed 1,5420 R/kWh) and bill an electrification and rural subsidy levy of 0,0547 R/kWh; NERSA's table prints neither

ChargeApplies toRate (VAT in)Unit
Fixed charge2 153.41R/month
Demand97.03R/kVA
Demand97.03R/kVA
Demandwinter524.76R/kVA
Demandsummer299.87R/kVA
Energywinter133.68c/kWh
Energysummer106.24c/kWh

Industrial Time of Use: Enerflex 400kV

industrial, tou · time-of-use tariff at 400 V; printed '400kV' [sic]; seasons as printed (High and Low Demand Season); the city's billing tariffs label them Jul - Aug and Sep - May; the city's tariff book ties Enerflex to Eskom's Muniflex structure; the city's 2026/27 billing tariffs add municipal surcharges to the energy, demand and network access charges (for example peak energy in the high demand season: plus 2,4846 R/kWh, billed 10,4497 R/kWh) and bill an electrification and rural subsidy levy of 0,0547 R/kWh; NERSA's table prints neither

ChargeApplies toRate (VAT in)Unit
Fixed charge2 153.41R/month
Demand71.60R/kVA
Demand71.60R/kVA
Demand61.62R/kVA
Energywinter peak915.99c/kWh
Energywinter standard251.31c/kWh
Energywinter off-peak177.46c/kWh
Energysummer peak397.55c/kWh
Energysummer standard236.54c/kWh
Energysummer off-peak177.46c/kWh
Reactive energy40.37c/kVArh

Industrial Time of Use: Enerflex 11kV

industrial, tou · time-of-use tariff at 11 kV; the schedule prints an 'Energy charges: Low Season' heading above the fixed charges; seasons as printed (High and Low Demand Season); the city's billing tariffs label them Jul - Aug and Sep - May; the city's tariff book ties Enerflex to Eskom's Muniflex structure; the city's 2026/27 billing tariffs add municipal surcharges to the energy, demand and network access charges (for example peak energy in the high demand season: plus 1,8542 R/kWh, billed 9,5737 R/kWh) and bill an electrification and rural subsidy levy of 0,0547 R/kWh; NERSA's table prints neither

ChargeApplies toRate (VAT in)Unit
Fixed charge5 487.57R/month
Fixed charge9 118.23R/month
Fixed charge2 153.41R/month
Demand74.44R/kVA
Demand74.51R/kVA
Demand30.92R/kVA
Energywinter peak887.74c/kWh
Energywinter standard243.57c/kWh
Energywinter off-peak172.01c/kWh
Energysummer peak385.28c/kWh
Energysummer standard229.26c/kWh
Energysummer off-peak172.01c/kWh
Reactive energy40.37c/kVArh

Industrial Time of Use (TOU): Enerflex 132Kv

industrial, tou · time-of-use tariff at 132 kV; seasons as printed (High and Low Demand Season); the city's billing tariffs label them Jul - Aug and Sep - May; the city's tariff book ties Enerflex to Eskom's Muniflex structure; the city's 2026/27 billing tariffs add municipal surcharges to the energy, demand and network access charges (for example peak energy in the high demand season: plus 1,1662 R/kWh, billed 8,3190 R/kWh) and bill an electrification and rural subsidy levy of 0,0547 R/kWh; NERSA's table prints neither

ChargeApplies toRate (VAT in)Unit
Fixed charge9 118.23R/month
Fixed charge2 153.41R/month
Demand46.48R/kVA
Demand46.48R/kVA
Demand11.99R/kVA
Energywinter peak822.57c/kWh
Energywinter standard225.68c/kWh
Energywinter off-peak159.34c/kWh
Energysummer peak356.99c/kWh
Energysummer standard212.42c/kWh
Energysummer off-peak159.34c/kWh
Reactive energy40.37c/kVArh

Special Tariff

industrial, conventional · specially designed tariff with one remaining customer, supplied at 11 kV and being phased out (city's 2025/26 tariff application); the city's billing adds a municipal surcharge (the city's 2026/27 tariff book: 7,6586 R/kWh plus 1,8197 R/kWh)

ChargeApplies toRate (VAT in)Unit
Fixed charge2 153.41R/month
Energy880.74c/kWh

Special Tariff: Temporary supplies

business, conventional · printed as a line of the Special Tariff table; the city's tariff book calls it the itinerant customers tariff; the city's 2026/27 tariff book adds a 2,4922 R/kWh municipal surcharge to 8,0543 R/kWh (billed 10,5465 R/kWh)

ChargeApplies toRate (VAT in)Unit
Energy926.24c/kWh