GridPulse ZA

South Africa's electricity, hour by hour

Live mix › Municipal tariffs › Msunduzi (Pietermaritzburg)

Msunduzi (Pietermaritzburg) electricity tariffs, 2026/27

Every approved electricity tariff in Msunduzi Municipality for 2026/27, from the schedules the municipality and the regulator publish. All rates on this page include VAT at 15%.

Estimates use the prepaid 60 A straight-line tariff. Credit-metered homes are on a different scale that adds R22.92 per amp per phase each month (2026/27, before VAT) to a basic charge and a lower energy rate, so their bills depend heavily on the size of their supply.

Tariff year shown2026/27
600 kWh a month costsR2 493
Tariff categories25
Standard home bill+6.9% on 2025/26

A 600 kWh month, year by year

On the tariff a 600 kWh home is billed on (S.3.1. Domestic straight line 60 Amps 1Phase), VAT included.

Estimate a bill for your own usage or go back to the municipality comparison.

The full 2026/27 schedule

Hover a charge for the printed wording where it needs context. Export credit scales and once-off fees are not part of a monthly bill and are not listed.

A.1. Domestic Single Phase (5A-80A)

residential, conventional · credit metered (Scale A in the city's register); single phase 5 A to 80 A

ChargeApplies toRate (VAT in)Unit
Fixed charge71.18R/month
Capacity26.36R/A/month
Energy260.59c/kWh

A.2 Alternative Tariff Void of Access/Availability Charge - 20 to 100 Amps 1 phase

residential, conventional · new tariff in 2026/27 (printed 'NEW TARIFF'); credit metered (Scale A in the city's register); no access/availability charge, one energy rate applies according to supply size

ChargeApplies toRate (VAT in)Unit
Fixed charge443.01R/month
Energy345.75c/kWh
Energy366.47c/kWh
Energy398.34c/kWh
Energy430.20c/kWh

A.3. 3 phase 5A-100A

residential, conventional · credit metered (Scale A in the city's register); three phase 5 A to 100 A

ChargeApplies toRate (VAT in)Unit
Fixed charge118.63R/month
Capacity19.42R/A/month
Energy260.59c/kWh

SO. Domestic Indigent 20A (prepaid)

residential, prepaid · printed 'SO' (Scale S0 in the city's register); prepaid 20 A, registered indigent households only; no basic charge

ChargeApplies toRate (VAT in)Unit
Energy312.47c/kWh
Free allowance70kWh/month

S1&S2. Domestic liefeline 20A and 40 Amps 1Phase

residential, prepaid · name as printed ('liefeline' [sic]); prepaid, energy charge only; covers the 20 A lifeline scale S1 and the 40 A straight line scale S2

ChargeApplies toRate (VAT in)Unit
Energy360.98c/kWh

S.3.1. Domestic straight line 60 Amps 1Phase

residential, prepaid · prepaid straight line tariff, energy charge only

ChargeApplies toRate (VAT in)Unit
Energy415.45c/kWh

S3.2, S3.3&S5 Low end 20Amp

residential, prepaid · prepaid two-part tariff; NERSA prints one line for scales S3.2, S3.3 and S5, and the city's register lists S3.3 and S5 as commercial prepaid scales; the city's 2026/27 register marks S3.3 and S5 as temporarily suspended and prints 402,95 c/kWh for S3.3

ChargeApplies toRate (VAT in)Unit
Energy473.58c/kWh
Fixed charge295.76R/month

S3.2/S3.3/S5/ Mid end straightline 60A

residential, prepaid · prepaid two-part tariff; NERSA prints one line for scales S3.2, S3.3 and S5, and the city's register lists S3.3 and S5 as commercial prepaid scales; the city's 2026/27 register marks S3.3 and S5 as temporarily suspended and prints 402,95 c/kWh for S3.3

ChargeApplies toRate (VAT in)Unit
Energy473.58c/kWh
Fixed charge369.71R/month

S3.2/S3.3/S5 High end straightline 80A

residential, prepaid · prepaid two-part tariff; NERSA prints one line for scales S3.2, S3.3 and S5, and the city's register lists S3.3 and S5 as commercial prepaid scales; the city's 2026/27 register marks S3.3 and S5 as temporarily suspended and prints 402,95 c/kWh for S3.3

ChargeApplies toRate (VAT in)Unit
Energy473.58c/kWh
Fixed charge462.12R/month

S4. 100 A 3phase (low - 20A)

residential, prepaid · prepaid three phase two-part tariff; 20 A supply per the city's register

ChargeApplies toRate (VAT in)Unit
Energy473.58c/kWh
Fixed charge443.62R/month

S4. High end straightline 100 amps 3phase (medium)

residential, prepaid · prepaid three phase two-part tariff; 40 A supply per the city's register

ChargeApplies toRate (VAT in)Unit
Energy463.38c/kWh
Fixed charge868.17R/month

S4. 100 amps 3phase (high)

residential, prepaid · prepaid three phase two-part tariff; 60 A supply per the city's register

ChargeApplies toRate (VAT in)Unit
Energy473.25c/kWh
Fixed charge1 386.35R/month

TD.1: Domestic Single Phase

residential, tou · domestic time-of-use, conditional on the smart meter rollout (city's register); high season June to August

ChargeApplies toRate (VAT in)Unit
Fixed charge143.35R/month
Energysummer peak322.30c/kWh
Energysummer standard232.45c/kWh
Energysummer off-peak159.94c/kWh
Energywinter peak917.63c/kWh
Energywinter standard300.03c/kWh
Energywinter off-peak179.40c/kWh
Demand26.37R/kVA

TD2: Domestic Three Phase

residential, tou · domestic time-of-use, conditional on the smart meter rollout (city's register); high season June to August

ChargeApplies toRate (VAT in)Unit
Fixed charge222.70R/month
Energysummer peak316.33c/kWh
Energysummer standard228.16c/kWh
Energysummer off-peak156.97c/kWh
Energywinter peak917.63c/kWh
Energywinter standard301.77c/kWh
Energywinter off-peak179.40c/kWh
Demand19.06R/kVA

B.1 Small power Single phase≤100

business, conventional · small power, up to 100 A per phase (city's register: up to 65 kVA); single phase

ChargeApplies toRate (VAT in)Unit
Energy286.07c/kWh
Fixed charge182.61R/month
Capacity55.43R/A/month

B.3: Three phase ≤100 Small Power

business, conventional · small power, up to 100 A per phase (city's register: up to 65 kVA); three phase

ChargeApplies toRate (VAT in)Unit
Energy286.07c/kWh
Fixed charge327.45R/month
Capacity46.74R/A/month

C.1: Three phase <100 Large Power

industrial, conventional · large power at low voltage, 65 to 500 kVA (city's register)

ChargeApplies toRate (VAT in)Unit
Fixed charge1 430.52R/month
Demand549.64R/kVA
Energy243.72c/kWh

Scale T1: Large Customer at MV

industrial, tou · time-of-use at 11 kV; high season June to August; the city's register also lists a reactive energy charge of 19,48 c/kvarh (reactive energy above 30% of kWh, peak and standard periods), not printed by NERSA

ChargeApplies toRate (VAT in)Unit
Fixed charge7 152.51R/month
Energysummer peak334.43c/kWh
Energysummer standard252.79c/kWh
Energysummer off-peak186.87c/kWh
Energywinter peak875.66c/kWh
Energywinter standard315.80c/kWh
Energywinter off-peak204.58c/kWh
Demand232.30R/kVA
Demand103.91R/kVA

Scale T2: Large User Scale at 400V

industrial, tou · time-of-use at 400 V; high season June to August; the city's register also lists a reactive energy charge of 18,95 c/kvarh (reactive energy above 30% of kWh, peak and standard periods), not printed by NERSA

ChargeApplies toRate (VAT in)Unit
Fixed charge1 332.07R/month
Energysummer peak351.20c/kWh
Energysummer standard263.13c/kWh
Energysummer off-peak196.17c/kWh
Energywinter peak919.46c/kWh
Energywinter standard331.60c/kWh
Energywinter off-peak214.80c/kWh
Demand255.54R/kVA
Demand114.30R/kVA

L.1 Whole Night

public, conventional · street lighting

ChargeApplies toRate (VAT in)Unit
Fixed charge104.07R/month
Energy224.74c/kWh

L2: 24 hour

public, conventional · street lighting

ChargeApplies toRate (VAT in)Unit
Fixed charge104.07R/month
Energy242.98c/kWh

L.3: Whole Night High Mast

public, conventional · street lighting

ChargeApplies toRate (VAT in)Unit
Fixed charge2 081.56R/month
Energy224.74c/kWh

L4: 24 Hrs Traffic

public, conventional · traffic signals

ChargeApplies toRate (VAT in)Unit
Energy242.98c/kWh

MEGAFLEX 1 - 132 kV 40MVA AND ABOVE CUSTOMERS

industrial, tou · 132 kV customers of 40 MVA and above; the RfD recommends 9,26% ('in line with the Eskom megaflex'); NERSA's own 4 August 2026 capture of approved tariffs and the city's approved 2026/27 register print different, higher Megaflex 1 charges, quoted per component; the RfD lists a municipal mark-up for Hulamin as per agreement without a rate; Eskom Megaflex based charges; the city's register states the Megaflex tariffs follow Eskom's structure, are negotiated and depend on agreement with the municipality

ChargeApplies toRate (VAT in)Unit
Fixed charge1 427.28R/day
Energysummer peak331.05c/kWh
Energysummer standard186.14c/kWh
Energysummer off-peak132.95c/kWh
Energywinter peak797.70c/kWh
Energywinter standard199.43c/kWh
Energywinter off-peak132.95c/kWh
Demand20.40R/kVA
Demand12.06R/kVA
Levy0.46c/kWh
Levy6.31c/kWh
Demand12.06R/kVA/month
Demand2.81R/kVA/month
Fixed charge24.71R/kVA/day
Reactive energy40.46c/kWh
Levy26.30c/kWh
Demand8.12R/kVA/month

MEGAFLEX 2 - 132 kV UNDER 40MVA CUSTOMERS

industrial, tou · 132 kV customers under 40 MVA; the RfD prints its 2025/26 base as the Megaflex 1 charges (service charge 1135.92) rather than the approved 8 933,98, so its printed increases (17,73% and similar) are measured from that base; Eskom Megaflex based charges; the city's register states the Megaflex tariffs follow Eskom's structure, are negotiated and depend on agreement with the municipality

ChargeApplies toRate (VAT in)Unit
Fixed charge1 537.93R/day
Energysummer peak354.18c/kWh
Energysummer standard199.02c/kWh
Energysummer off-peak142.24c/kWh
Energywinter peak853.45c/kWh
Energywinter standard213.37c/kWh
Energywinter off-peak142.24c/kWh
Demand22.05R/kVA
Demand12.99R/kVA
Levy0.49c/kWh
Levy6.80c/kWh
Demand12.99R/kVA/month
Demand3.01R/kVA/month
Fixed charge26.63R/kVA/day
Reactive energy43.60c/kWh
Levy28.35c/kWh
Demand12.20R/kVA/month

Sources

The numbers above are transcribed from these documents:

Other municipalities in KwaZulu-Natal: Newcastle, eThekwini (Durban), uMhlathuze (Richards Bay).

See the live mix on GridPulse ZA