Newcastle electricity tariffs, 2026/27

Every approved electricity tariff in Newcastle Local Municipality for 2026/27, from the schedules the municipality and the regulator publish. All rates on this page include VAT at 15%.

Tariff year shown2026/27
600 kWh a month costsR2 464
Tariff categories15
Standard home bill+8.4% on 2025/26

A 600 kWh month, year by year

On the tariff a 600 kWh home is billed on (Scale 2 : 60A domestic supplies (Prepayment Meter Tariff)), VAT included.

Estimate a bill for your own usage or go back to the municipality comparison.

The full 2026/27 schedule

Hover a charge for the printed wording where it needs context. Export credit scales and once-off fees are not part of a monthly bill and are not listed.

Scale 1 : 20A Domestic Supplies

residential, conventional · 20 A single-phase domestic supply; the municipality's tariff documents also place churches, charities and sporting bodies with a 20 A load on this scale

ChargeApplies toRate (VAT in)Unit
Fixed charge112.30R/month
Energy245.06c/kWh

Scale 1 : 20A Domestic Supplies (Prepayment meter tariff)

residential, prepaid · no basic charge printed

ChargeApplies toRate (VAT in)Unit
Energy351.44c/kWh

Scale 2 : 60A domestic supplies

residential, conventional · 60 A single-phase domestic supply on a conventional meter; the prepaid version carries the same rates. The municipality's own tariff documents subsidise indigent households up to 50 kWh a month, which NERSA's schedule does not print

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh245.23c/kWh
Energy51 to 350 kWh314.88c/kWh
Energy351 to 600 kWh352.84c/kWh
Energyabove 600 kWh364.01c/kWh
Fixed charge514.71R/month

Scale 2 : 60A domestic supplies (Prepayment Meter Tariff)

residential, prepaid · same rates and basic charge as the conventional Scale 2 tariff

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh245.23c/kWh
Energy51 to 350 kWh314.88c/kWh
Energy351 to 600 kWh352.84c/kWh
Energyabove 600 kWh364.01c/kWh
Fixed charge514.71R/month

Scale 2 : 60A domestic supplies (Vacant lot)

residential, conventional · monthly charge for a vacant stand where electricity can be connected; no energy charge

ChargeApplies toRate (VAT in)Unit
Fixed charge500.26R/month

Scale 2 : 60A domestic supplies (Time of use)

residential, tou

ChargeApplies toRate (VAT in)Unit
Fixed charge514.71R/month
Energysummer peak510.52c/kWh
Energysummer standard266.47c/kWh
Energysummer off-peak145.11c/kWh
Energywinter peak842.03c/kWh
Energywinter standard323.14c/kWh
Energywinter off-peak191.25c/kWh

Scale 3 : Large domestic supplies and small business premises

business, conventional · small business below 65 kVA at low voltage, and large domestic supplies

ChargeApplies toRate (VAT in)Unit
Fixed charge1 423.36R/month
Energy342.25c/kWh

Scale 3 : Large domestic supplies and small business premises (Vacant business stand)

business, conventional · monthly charge for a vacant stand where electricity can be connected; no energy charge

ChargeApplies toRate (VAT in)Unit
Fixed charge1 419.72R/month

Scale 3 : Large domestic supplies and small business premises (Time of Use)

business, tou · NERSA's decision prints these energy rates unchanged from 2025/26 (0% increase) although the municipality applied for 9%; the rates shown are the ones in the decision

ChargeApplies toRate (VAT in)Unit
Fixed charge1 423.36R/month
Energysummer peak346.53c/kWh
Energysummer standard220.51c/kWh
Energysummer off-peak114.26c/kWh
Energywinter peak598.32c/kWh
Energywinter standard255.13c/kWh
Energywinter off-peak123.85c/kWh

Scale 4 : Medium business and industrial premises (Vacant Stand)

business, conventional · monthly charge for a vacant stand where electricity can be connected; no energy charge

ChargeApplies toRate (VAT in)Unit
Fixed charge1 419.85R/month

Scale 4 : Medium business and industrial premises (Standard)

business, conventional · notified maximum demand from 65 kVA to below 500 kVA at low voltage

ChargeApplies toRate (VAT in)Unit
Fixed charge3 061.55R/month
Energy185.55c/kWh
Demand328.14R/kVA
Demand284.60R/kVA

Scale 4 : Medium business and industrial premises (Time of Use)

business, tou · notified maximum demand from 65 kVA to below 500 kVA at low voltage

ChargeApplies toRate (VAT in)Unit
Fixed charge3 061.55R/month
Energysummer peak618.41c/kWh
Energysummer standard278.19c/kWh
Energysummer off-peak173.14c/kWh
Energywinter peak730.95c/kWh
Energywinter standard370.70c/kWh
Energywinter off-peak209.09c/kWh
Demand103.05R/kVA
Demand77.07R/kVA

Scale 5 : Large business and industrial premises (Vacant Stand)

industrial, conventional · monthly charge for a vacant stand where electricity can be connected; no energy charge

ChargeApplies toRate (VAT in)Unit
Fixed charge1 419.85R/month

Scale 5 : Large business and industrial premises (standard)

industrial, conventional · notified maximum demand from 500 kVA to below 4 500 kVA at medium or high voltage

ChargeApplies toRate (VAT in)Unit
Fixed charge6 013.23R/month
Energy185.55c/kWh
Demand298.24R/kVA
Demand264.45R/kVA

Scale 5 : Large business and industrial premises (Time of Use)

industrial, tou · notified maximum demand from 500 kVA to below 4 500 kVA at medium or high voltage

ChargeApplies toRate (VAT in)Unit
Fixed charge6 013.23R/month
Energysummer peak371.15c/kWh
Energysummer standard236.18c/kWh
Energysummer off-peak122.56c/kWh
Energywinter peak640.92c/kWh
Energywinter standard273.19c/kWh
Energywinter off-peak132.74c/kWh
Demand102.42R/kVA
Demand77.73R/kVA