Sol Plaatje (Kimberley) electricity tariffs, 2026/27

Every approved electricity tariff in Sol Plaatje Municipality for 2026/27, from the schedules the municipality and the regulator publish. All rates on this page include VAT at 15%.

The home tariff here charges per amp of supply; estimates assume a 60 A single-phase connection. The regulator's 2026/27 decision leaves Sol Plaatje's basic charges blank, so that year's estimate carries only the per-amp charge, and the city's own 2026/27 budget raises domestic rates by 5.5% rather than the approved 8%, so bills may come in lower than shown.

Tariff year shown2026/27
600 kWh a month costsR2 324
Tariff categories14
Standard home bill+3.0% on 2025/26

A 600 kWh month, year by year

On the tariff a 600 kWh home is billed on (Domestic Tariff (Conventional and Prepaid) > 20 Amps), costed at a 60 A supply, VAT included.

Estimate a bill for your own usage or go back to the municipality comparison.

The full 2026/27 schedule

Hover a charge for the printed wording where it needs context. Export credit scales and once-off fees are not part of a monthly bill and are not listed.

Indigents Tariff (Prepaid) 20 Amps

residential, prepaid · indigent scale, 20 A supply; block 1 is marked subsidised; the municipality's final 2026/27 budget raises domestic and indigent rates by 5.5% instead of the approved 8%, so bills sit slightly below these figures

ChargeApplies toRate (VAT in)Unit
Energy0 to 50 kWh3.19R/kWh
Energy51 to 350 kWh3.19R/kWh
Energyabove 350 kWh4.46R/kWh
Free allowance50kWh/month

Domestic Tariff (Conventional and Prepaid) = 20 Amps

residential, conventional · one scale for both conventional and prepaid meters; 20 A supply, no basic or capacity charge printed; the municipality's final 2026/27 budget raises domestic and indigent rates by 5.5% instead of the approved 8%, so bills sit slightly below these figures

ChargeApplies toRate (VAT in)Unit
Energy0 to 350 kWh3.41R/kWh
Energyabove 350 kWh4.31R/kWh

Domestic Tariff (Conventional and Prepaid) > 20 Amps

residential, conventional · one scale for both conventional and prepaid meters; supplies above 20 A also pay a capacity charge per amp per phase and a basic charge, but the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown; the municipality's final 2026/27 budget raises domestic and indigent rates by 5.5% instead of the approved 8%, so bills sit slightly below these figures

ChargeApplies toRate (VAT in)Unit
Capacity5.19R/A/phase/month
Energy0 to 350 kWh3.18R/kWh
Energyabove 350 kWh3.60R/kWh

Public Benefit and Schools: Conventional and Prepayment

public, conventional · one scale for both conventional and prepaid meters; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Capacity6.03R/A/phase/month
Energywinter3.99R/kWh
Energysummer3.74R/kWh

Business Tariff: Small Power Users (Conventional and prepaid)

business, conventional · one scale for both conventional and prepaid meters; both blocks carry the same rate; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Capacity5.19R/A/phase/month
Energy0 to 1200 kWh, winter3.87R/kWh
Energyabove 1200 kWh, winter3.87R/kWh
Energy0 to 1200 kWh, summer3.60R/kWh
Energyabove 1200 kWh, summer3.60R/kWh

Time of Use: NPO, NGO, SCHOOLS: LV <200 KVA

public, tou · time-of-use scale for non-profit organisations, NGOs and schools; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Demand237.94R/kVA
Demand113.17R/kVA
Energywinter peak8.24R/kWh
Energywinter standard3.31R/kWh
Energywinter off-peak2.30R/kWh
Energysummer peak3.53R/kWh
Energysummer standard2.71R/kWh
Energysummer off-peak2.12R/kWh

Time of Use: NPO, NGO, SCHOOLS: LV ≥ 200 < 500 kVA (exception 800 kVA)

public, tou · time-of-use scale for non-profit organisations, NGOs and schools; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Demand237.94R/kVA/month
Demand113.17R/kVA/month
Energywinter peak8.30R/kWh
Energywinter standard3.36R/kWh
Energywinter off-peak2.33R/kWh
Energysummer peak3.62R/kWh
Energysummer standard2.77R/kWh
Energysummer off-peak2.16R/kWh

Time of Use: NPO, NGO, SCHOOLS: MV

public, tou · time-of-use scale for non-profit organisations, NGOs and schools; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Demand184.56R/kVA/month
Demand87.40R/kVA/month
Energywinter peak8.32R/kWh
Energywinter standard3.42R/kWh
Energywinter off-peak2.41R/kWh
Energysummer peak3.71R/kWh
Energysummer standard2.83R/kWh
Energysummer off-peak2.22R/kWh

BULK CONSUMER: LV <200 kVA

industrial, tou · time-of-use scale for bulk consumers; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Demand251.99R/kVA/month
Demand92.68R/kVA/month
Energywinter peak9.08R/kWh
Energywinter standard3.39R/kWh
Energywinter off-peak2.47R/kWh
Energysummer peak3.71R/kWh
Energysummer standard2.75R/kWh
Energysummer off-peak2.27R/kWh
Reactive energy0.34R/kvarh

BULK CONSUMER: LV ≥ 200 < 500 kVA (exception 800 kVA)

industrial, tou · time-of-use scale for bulk consumers; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Demand198.61R/kVA/month
Demand92.68R/kVA/month
Energywinter peak9.14R/kWh
Energywinter standard3.43R/kWh
Energywinter off-peak2.63R/kWh
Energysummer peak3.70R/kWh
Energysummer standard2.83R/kWh
Energysummer off-peak2.36R/kWh
Reactive energy0.34R/kvarh

BULK CONSUMER: MV (Medium Voltage)

industrial, tou · time-of-use scale for bulk consumers; the 2026/27 decision prints no value on the basic charge row, so no basic charge is shown

ChargeApplies toRate (VAT in)Unit
Demand170.59R/kVA/month
Demand88.19R/kVA/month
Energywinter peak9.12R/kWh
Energywinter standard3.34R/kWh
Energywinter off-peak2.59R/kWh
Energysummer peak3.60R/kWh
Energysummer standard2.79R/kWh
Energysummer off-peak2.27R/kWh
Reactive energy0.34R/kvarh

SMALL CONSUMER: TOU <70 KVA: Domestic & Commercial (compulsory for SSEG customers.)

residential, tou · compulsory time-of-use scale for customers with small-scale embedded generation; the decision prints no value for the domestic basic charge and a dash for the commercial one, so no basic charge is shown; the export credit scale is not included

ChargeApplies toRate (VAT in)Unit
Capacity5.19R/A/phase/month
Energywinter peak11.21R/kWh
Energywinter standard3.40R/kWh
Energywinter off-peak1.84R/kWh
Energysummer peak3.66R/kWh
Energysummer standard2.52R/kWh
Energysummer off-peak1.60R/kWh

Streetlights

public, conventional

ChargeApplies toRate (VAT in)Unit
Fixed charge122.07R/month
Energy0.99R/kWh

Availability

public, conventional · monthly availability charge, printed 'Fixed R/month'; not a consumption tariff

ChargeApplies toRate (VAT in)Unit
Levy660.82R/month

Sources

The numbers above are transcribed from these documents: